11 Things to Know Before Installing a Skylight

A successful skylight project starts long before the roof is opened. Understand the room, roof, product, flashing, shaft, trades and final scope before approving the installation.

  • Roof and room suitability
  • Fixed, opening and sun tunnel options
  • Installation-day preparation
12,000+installations since 2018
VELUXPremier Dealer
5.0 ★Google-rated team
Melbournelocal installation team
The essential checklist

What to confirm before installation begins

These decisions affect the light, comfort, appearance, weatherproofing and final installed cost.

01

Start with the room—not the product

Define the real objective. A dark hallway may need a sun tunnel, while a kitchen may benefit from a full opening skylight. The room’s use, dimensions, ceiling height and furniture layout should guide the product.

02

Confirm the roof system

Roof pitch, tile or metal profile, framing, drainage and access determine which skylight and flashing method can be installed. Flat and low-pitch roofs can accept purpose-designed skylights when the correct system is used.

03

Choose light, ventilation—or both

A fixed skylight provides daylight and a sky view. Manual, solar and electric models can also release warm or humid air. Do not pay for an opening model unless the room will benefit from it.

04

Do not choose size in isolation

A larger unit may create more light, but it can also increase glare or concentrate light in one area. Room proportion, orientation, shaft shape and spacing should be considered together.

05

Understand orientation and shade

Morning and afternoon sun behave differently. Nearby trees, neighbouring buildings and roof direction affect light, heat and seasonal performance. There is no single orientation that is automatically best for every room.

06

Plan the light shaft

Where the ceiling sits below the roof, a shaft connects the skylight to the room. Its depth, width, angle and finish strongly affect how daylight spreads and how the completed installation looks.

07

Allow for roof-space obstructions

Trusses, rafters, ducts, pipes, wiring, insulation and air-conditioning equipment can limit the location. Some services may need to be relocated before the shaft is closed and plastered.

08

Compare glazing and light control

Low-E glazing, argon gas and laminated inner panes support comfort and safety. Bedrooms, media rooms and exposed positions may also benefit from a compatible blind.

09

Check exactly what the quote includes

Confirm product, flashing, roof labour, framing, shaft, plastering, sanding, electrical work, service relocation, rubbish removal and painting. A low price may simply exclude important work.

10

Prepare the home for installation day

Clear furniture and valuables, protect access paths, provide safe parking and keep children and pets away from the work area. The homeowner should be available to confirm final room positions before cutting begins.

11

Choose installation experience—not product alone

The skylight, flashing, roof opening and internal shaft operate as one system. Correct installation and roof-specific detailing are as important as the brand printed on the glass.

Use the quote as the project plan

A good quotation should leave very little to guesswork. It should identify the selected solution, included trades, exclusions, payment terms and what the homeowner must complete.

Room-by-room direction

Different rooms need different skylights

Kitchen

Fixed for strong daylight; manual, solar or electric opening when high-level ventilation is also useful.

Bathroom

An opening skylight can add daylight, privacy and natural ventilation. Mechanical exhaust requirements remain separate.

Living and dining

Fixed skylights often provide the best balance of light, visual impact and value. Multiple units can improve distribution.

Bedroom

Consider orientation, early morning light, privacy, ventilation and an optional blind before selecting the size.

Hallway

A sun tunnel is often sufficient for a standard dark hall. A full skylight suits a wide entrance or feature stairwell.

Walk-in robe or pantry

A compact daylight tube can remove daytime darkness without building a full plaster light shaft.

Roof suitability

The roof decides the installation system

A skylight should never be selected from internal room measurements alone.

Roof conditionTypical solutionWhat must be checked
Pitched tiled roofFS, VS, VSS, VSE or roof windowsRoof pitch, tile profile, flashing kit, rafters and shaft location
Pitched corrugated metal roofPitched-roof VELUX with suitable custom flashingSheet profile, back flashing, roof access and drainage path
Flat or low-pitch roofFCM fixed, VCM manual or VCS solarMinimum pitch, kerb or upstand, custom flashing and water flow
Kliplok or concealed-fix roofRoof-specific custom installationSheet layout, clip system, water path and installer experience
Cathedral ceilingDirect-mounted skylight or roof windowRoof pitch, reach, framing and internal lining detail
Deep roof cavityFull shaft or sun tunnel depending on goalShaft length, light spread, framing and service obstructions
Think beyond the skylight

What may be included in the complete project?

Roof opening and structural framing

The opening may need timber framing around rafters or trusses, subject to the roof structure.

Skylight and flashing

The flashing must suit the exact roof material, profile and pitch.

Light shaft construction

A framed shaft may be required between the roof and ceiling opening.

Plastering and sanding

The internal shaft can be finished ready for the homeowner’s painter.

Electrical work

Electric skylights, switches or nearby services may require a licensed electrician.

Duct, pipe or wiring relocation

Existing services may need to move before the shaft can be closed.

Optional blinds and accessories

Light-control products should be considered before finishing high or difficult-to-access shafts.

Painting

Central Skylights does not include final painting. The plastered shaft is prepared for your painter.

Installation sequence

What happens during a typical skylight project?

The exact order depends on the roof, ceiling and number of skylights, but the project commonly follows these stages.

Roof and structural work

Confirm the final positionCheck the room location against framing, roof conditions and services.
Protect the work areaPrepare internal access and roof access before cutting.
Create and frame the openingsForm the roof and ceiling openings and install required framing.
Install skylight and flashingComplete the roof-specific weatherproofing system.

Internal finishing

Build the light shaftConnect the roof opening to the ceiling and shape the daylight path.
Resolve servicesRelocate affected ducts, pipes or wiring before closing the shaft.
Plaster and sandFinish joints and surfaces ready for painting.
Final painting by ownerAllow the plaster finish to be painted as part of the homeowner’s scope.
Timing varies: Weather, roof access, structural changes, plaster drying, service relocations and the number of units can change the schedule. Ask for the expected sequence for your specific project rather than relying on a generic number of days.

Unsure what is above the ceiling?

A home visit can confirm roof type, framing, likely shaft position, obstructions and suitable VELUX models before installation is booked.

Avoid expensive surprises

Common mistakes before installing a skylight

Buying from size alone

The unit may fit the room but not the roof framing, pitch, flashing system or intended shaft.

Choosing only by price

A lower quote may exclude plastering, structural work, flashing, electrical work or rubbish removal.

Assuming every skylight opens

Fixed models provide light only. Ventilation requires a suitable manual, solar or electric model.

Ignoring glare and light control

A bedroom or exposed roof position may need careful sizing, placement or an optional blind.

Treating flashing as an accessory

Flashing is part of the roof weatherproofing system and must match the roof profile and pitch.

Forgetting the shaft finish

The internal shaft can be a major visual feature. Shape, plaster finish and paint affect the final appearance.

Ignoring roof-space services

Ducts, wiring and plumbing may sit directly above the preferred ceiling position.

Not confirming painting

Plastering and sanding do not normally mean that final painting is included.

Approving a vague scope

The quote should clearly identify inclusions, exclusions, selected products and homeowner responsibilities.

Questions for your installer

Ask these before you approve the project

?
Which exact skylight and flashing system are quoted?

Request the model, size, operating type and roof-specific flashing method.

?
Who completes the framing and plaster shaft?

Confirm whether these trades are included or must be arranged separately.

?
What happens if a duct or pipe is found?

Ask who coordinates relocation and whether additional costs may apply.

?
Is final painting included?

Make sure the finish level and painting responsibility are understood.

?
How will the roof profile be weatherproofed?

This is especially important on corrugated, Trimdek, Kliplok and low-pitch roofs.

?
What access and preparation are required?

Confirm parking, internal clearance, roof access and customer attendance.

?
What is excluded from the quote?

Exclusions are often just as important as the listed inclusions.

?
What happens if weather interrupts the work?

Ask how the roof opening and internal work will be managed safely.

Before installation day

Homeowner preparation checklist

01

Clear the room

Move furniture, artwork, electronics and fragile items away from the work area.

02

Protect access

Keep hallways, driveways and roof-access areas clear for installers and materials.

03

Plan for dust and noise

Roof cutting, framing and plaster work can create noise and temporary disruption.

04

Be available

A decision-maker should confirm the final internal position before work begins.

05

Secure pets and children

Keep them away from ladders, tools and the active work zone.

06

Confirm service relocations

Arrange electrical, duct or plumbing changes where identified in advance.

07

Prepare for painting

Plan the final paint colour and painter after the plaster work has been completed.

08

Review the final scope

Check the model, location, inclusions and exclusions once more before cutting.

Frequently asked questions

Before installing a skylight

Do I need to know which skylight model I want before getting a quote?

No. Room and roof photos can support an initial recommendation, while a home visit can confirm framing, roof profile, suitable locations and product options.

Can skylights be installed on flat or low-pitch roofs?

Yes. Purpose-designed flat and low-pitch models such as VELUX FCM, VCM and VCS can be installed when the roof pitch and flashing or kerb system meet the project requirements.

Should I choose a fixed or opening skylight?

Choose fixed when natural light is the main objective and the room already has suitable ventilation. Choose an opening model when releasing warm or humid air adds useful value.

How large should my skylight be?

The answer depends on room dimensions, roof orientation, ceiling height, shaft depth, glazing and the desired daylight level. Bigger is not always better.

Will the installation damage the ceiling?

A new full skylight usually requires a planned ceiling opening and, where the roof is above a ceiling cavity, a finished light shaft. This is construction work rather than accidental damage.

Does skylight installation include plastering?

It depends on the quotation. Central Skylights can include shaft framing, plastering and sanding. Final painting is not included.

What if there are ducts or pipes above the proposed position?

The location may be adjusted, or the affected service may need relocation before the shaft is closed. Responsibility and possible additional cost should be confirmed in the quote.

Can a skylight be installed in one day?

Some roof installations may be completed quickly, but full projects involving framing, a deep shaft, plastering, service relocation or multiple units can require additional stages. Weather can also affect the schedule.

Do I need a blind?

Not always. Bedrooms, media rooms and roof positions exposed to strong sun are the most likely to benefit from light control.

Is a sun tunnel easier to install than a skylight?

Often, because the openings are smaller and a full plaster shaft is not usually required. However, a long or obstructed tube route can still make the installation more complex.

Should I be home during installation?

Yes, a homeowner or authorised decision-maker should be available at the start to confirm the internal position and answer any unexpected site questions.

What is the most important part of a skylight installation?

The product, roof opening, flashing, drainage, framing and internal shaft must work together. Correct roof-specific installation is just as important as choosing a quality skylight.

Plan before cutting

Get the room, roof and installation scope right from the beginning

Book a free Melbourne home assessment, send photos for an online quote, or visit the Central Skylights showroom in Noble Park.

Read: How to Choose the Right Skylight →